Glossary entry (derived from question below)
English term or phrase:
Open Pit Mine Heap
Serbian translation:
gomile jalovine s površinskog kopa
Added to glossary by
Ana_pg
Dec 14, 2013 13:55
10 yrs ago
5 viewers *
English term
Open Pit Mine Heap
English to Serbian
Tech/Engineering
Mining & Minerals / Gems
Location: The heaps are located around the Brskovo OPM (coordinates: X: 387945 Y: 4756056). All heaps could not be completely documented due to its steepness and impermeability of the terrain.
Origin: Relates to needs to dispose of the waste rock from OPM.
Method of construction: Piling/end-dumping.
Dimensions: The whole area of OPM covers 98 000 m2, heaps cover 26 000 m2.
Composition: Tuffs, shales, sandstones, limestones, keratophyres, cherts, vein quartz.
Morphology, geohazards: Tops of the heaps are morphologically dissected. The maximum gradient of the slope is > 60°, average gradient is 40° – 60° (estimated).
Hydrology: On the upper plateau there is no accumulation of precipitation water. Rills are often on the slopes of heaps.
Biota: The surface of the heap is without soil cover. It is sparsely overgrown with birches. Vegetation is more common in places with less dynamic surface runoff.
Analyses:One composite sample was taken from the heap from the depth 0 – 0,2 m. For results see table 2.
Origin: Relates to needs to dispose of the waste rock from OPM.
Method of construction: Piling/end-dumping.
Dimensions: The whole area of OPM covers 98 000 m2, heaps cover 26 000 m2.
Composition: Tuffs, shales, sandstones, limestones, keratophyres, cherts, vein quartz.
Morphology, geohazards: Tops of the heaps are morphologically dissected. The maximum gradient of the slope is > 60°, average gradient is 40° – 60° (estimated).
Hydrology: On the upper plateau there is no accumulation of precipitation water. Rills are often on the slopes of heaps.
Biota: The surface of the heap is without soil cover. It is sparsely overgrown with birches. Vegetation is more common in places with less dynamic surface runoff.
Analyses:One composite sample was taken from the heap from the depth 0 – 0,2 m. For results see table 2.
Proposed translations
(Serbian)
4 +2 | gomile jalovine s površinskog kopa | Daryo |
3 | naslage rude otvorenog kopa | Aleksandra Lazić |
4 -1 | gomila iskopine ili iskopina površinskog kopa | LogosART |
Proposed translations
+2
1 day 20 hrs
Selected
gomile jalovine s površinskog kopa
Origin: Relates to needs to dispose of the waste rock from OPM
=>
u pitanju je materijal koji preostane kada se iz iskopanog materijala izdvoji korisni deo (ruda , ugalj itd.) - tone i tone jalovine, od kojih ponekad narastu prava brda.
= "gomile jalovine" ponekad "brda jalovine" ili "jalovište"
http://www.youtube.com/watch?v=XcA9IqysMQk
http://en.wikipedia.org/wiki/Brskovo
=>
u pitanju je materijal koji preostane kada se iz iskopanog materijala izdvoji korisni deo (ruda , ugalj itd.) - tone i tone jalovine, od kojih ponekad narastu prava brda.
= "gomile jalovine" ponekad "brda jalovine" ili "jalovište"
http://www.youtube.com/watch?v=XcA9IqysMQk
http://en.wikipedia.org/wiki/Brskovo
Note from asker:
Hvala! |
4 KudoZ points awarded for this answer.
12 mins
naslage rude otvorenog kopa
predlog
Note from asker:
Hvala! |
-1
2 hrs
gomila iskopine ili iskopina površinskog kopa
gomila iskopine/iskopina površinskog kopa
Filling of the transverse intersection nominal surface of the run of-mine heap (0.224 m2) on the belt is about 36%.
Popunjenost nominalne površine poprečnog preseka iskopine (0,224
m2) na traci je oko 36%.
a small filling of the transverse intersection of the run-of-mine heap on the belt (from 0 to 54%)
pri tome male brzine trake produžuju vreme ciklusa trake i njen vek trajanja; mala ispunjenost poprečnog preseka gomilama iskopine na traci (od 0 do 54%)
http://www.sjf.tuke.sk/transportlogistics/wp-content/uploads...
Filling of the transverse intersection nominal surface of the run of-mine heap (0.224 m2) on the belt is about 36%.
Popunjenost nominalne površine poprečnog preseka iskopine (0,224
m2) na traci je oko 36%.
a small filling of the transverse intersection of the run-of-mine heap on the belt (from 0 to 54%)
pri tome male brzine trake produžuju vreme ciklusa trake i njen vek trajanja; mala ispunjenost poprečnog preseka gomilama iskopine na traci (od 0 do 54%)
http://www.sjf.tuke.sk/transportlogistics/wp-content/uploads...
Note from asker:
Hvala! |
Peer comment(s):
disagree |
Daryo
: wrong scale and wrong stage of production- your refs are about heaps of raw material on a conveyer belt (about half-meter wide), the ST is about heaps of waste rock tens of metres high
1 day 18 hrs
|
Something went wrong...